As-built or as-constructed drawings are submitted for dike construction projects in British Columbia. The tables below provide as-built drawings and significant reports for dikes operated and maintained in the Lower Mainland.
Documents are listed by diking authority and can be identified by publication number, publication title or professional engineering consultant.
City of Abbotsford
As-constructed dike drawings |
|||
District of Abbotsford |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Project 8, Contract 5, As-constructed Works - Improvements to Sumas and Vedder Canal Dikes |
Crippen Engineering Ltd. |
|
District of Abbotsford |
1983-84 Flood Control Program, Contract 1, As-constructed,Upper Sumas River Dyke |
Crippen Consultants |
|
District of Abbotsford |
1983-84 Flood Control Program, Contract 2, As-constructed, Upper Sumas River Dyke |
Crippen Consultants |
|
District of Abbotsford |
District of Matsqui, Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Drawings |
Associated Engineering Services Ltd. |
Fraser River flood control program design reports |
||
District of Abbotsford |
Appendix 4, Abbotsford Project Report on First Stage, Final Design, Subsurface Investigation for Vedder Canal and Lower Sumas Dikes |
Vedder River management area plan |
||
Corporation of the District of Chilliwack |
Vedder River Management Area Plan, Sept 1983 |
UMFW 2007 as-built drawings and completion report for 2007 works |
|||
District of Abbotsford |
Completion Report for Matsqui and Vedder Dike Upgrades |
Golder Associates Ltd. |
|
District of Abbotsford |
James Treatment Plant Dyke Construction, 5959 Gladwin Road |
Golder Associates Ltd. |
|
District of Abbotsford |
Matsqui Dyke 2007 Upgrade |
Golder Associates Ltd. |
|
District of Abbotsford |
2007 Vedder Dyke Upgrade, Barrowtown to Keith Wilson |
Golder Associates Ltd. |
Albion District
UMFW 2007 as-built drawings and design report for Albion Dike |
|||
Albion |
Design Brief, Dike Repair Works, Stn 1+000 to 3+060 Albion Dike River Road, Opposite Tamarack Lane, Maple Ridge B.C. |
Geo Media Engineering Ltd. April 2007 |
|
Albion |
As-built drawings for Albion Dike |
Corporation of the District of Maple Ridge November 2007 |
City of Chilliwack
Overview studies relating to the City of Chilliwack flood control program |
|||
The Corporation of the District of Chilliwack |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Improvements to East Dike, West Dike, Internal Drainage and Bank Protection - Various Locations |
Willis, Cunliffe, Tait & Co., Dayton & Knight Ltd., Crippen Engineering Ltd., Bland Engineering Ltd., JW Wedler & Assoc. |
Fraser River flood control program design reports |
|||
The Corporation of the District of Chilliwack |
Vedder Setback Dykes Geotechnical Report |
Hillis Consulting Services, Nov 1978 |
|
The Corporation of the District of Chilliwack |
Chilliwack Flood Protection Dykes Upgrade, Geotechnical Report, Chilliwack B.C. |
AMEC Earth & Environmental Ltd. |
Vedder River management area plan |
|||
The Corporation of the District of Chilliwack |
Vedder River Management Area Plan, Sept. 1983 |
The Vedder River Management Committee |
UMFW 2007 as-built drawings for East Dyke and Wing Dyke upgrades |
|||
The Corporation of the District of Chilliwack |
East Dyke and Wing Dyke Upgrades, 2007 Construction |
Dayton & Knight Ltd. Consulting Engineers |
City of Coquitlam
Fraser River flood control program as-constructed drawings |
|||
District of Coquitlam City of Port Coquitlam |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2 As-constructed Drawings Part 1: Pitt River Flood Control Works, Part 2: Coquitlam River Flood Control Works |
Crippen Engineering Ltd., Associated Engineering |
Study reports |
|||
City of Port Coquitlam |
Coquitlam River Hydrology Review |
Water Management Consultants |
UMFW 2007 as-built drawings and design reports |
|||
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank |
Associated Engineering |
|
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike |
Associated Engineering |
|
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pump Station |
Associated Engineering, Golder Associates |
|
City of Port Coquitlam |
Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works Pitt River Dike, Port Coquitlam B.C. |
Golder Associates |
|
City of Port Coquitlam |
Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works IR#2 and Colony Farms Dike, Pitt River Road, Port Coquitlam B.C. |
Golder Associates |
Colebrook Diking District
Operation and maintenance manuals and as-constructed drawings for City of Surrey, Surrey Diking District, Colebrook Diking District and Mud Bay Diking District |
|||
Colebrook Diking District |
Colebrook Diking District Serpentine River Flood Control Works Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
City of Surrey |
District of Surrey Serpentine River and Crescent Beach Flood Control Works Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
Mud Bay Diking District |
Mud Bay Diking District Serpentine and Nicomekl Rivers Flood Control Works Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings, Serpentine and Nicomekl Dams |
Associated Engineering Services Ltd. |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Bridgeview |
Crippen Consultants |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, Volume 4, As-constructed Works for Contract No. 2, Bridgeview and South Westminster |
Crippen Consultants |
|
City of Surrey |
City of Surrey, Operation and Maintenance Instructions, Flood Control Works, Upgrades to Stops Log and Flood Walls, Bridgeview and South Westminster |
Associated Engineering |
|
City of Surrey |
City of Surrey, Crescent Beach Flood Mitigation Works, Operation and Maintenance Manual |
Hay & Company Consultants Inc. |
Design reports |
|||
City of Surrey |
South Westminster Area Flood Control Works Report on Final Design First Stage |
Crippen Engineering Ltd., 11 April 1975 |
UMFW 2007 as-built drawings and completion report for 2007 works |
|||
City of Surrey |
Freshet 2007 Urgent Mitigative Flood Works As-constructed Report and Drawings |
Associated Engineering |
Coquitlam Diking District
Fraser River flood control program as-constructed drawings |
|||
District of Coquitlam City of Port Coquitlam |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2, As-constructed Drawings Part 1: Pitt River Flood Control Works, Part 2: Coquitlam River Flood Control Works |
Crippen Engineering Ltd., Associated Engineering |
Study reports |
|||
City of Port Coquitlam |
Coquitlam River Hydrology Review |
Water Management Consultants |
UMFW 2007 as-built drawings and design reports |
|||
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank |
Associated Engineering |
|
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike |
Associated Engineering |
|
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pump Station |
Associated Engineering, Golder Associates |
|
City of Port Coquitlam |
Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, Pitt River Dike, Port Coquitlam, B.C. |
Golder Associates |
|
City of Port Coquitlam |
Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, IR#2 and Colony Farms Dike, Pitt River Road, Port Coquitlam, B.C. |
Golder Associates |
Corporation of Delta
Fraser River flood control program as-constructed drawings |
|||
District of Delta |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 1, As-constructed Drawings, Contracts 1, 2, 4, 6, 6A, 6B, 7, 9, 9A, 9B |
Associated Engineering Services Ltd. |
|
District of Delta |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2, As-constructed Drawings, Contracts 12, 15A, 18, 20 22, 23, Westham Island (Contracts 1 and 2) |
Associated Engineering Services Ltd. |
Design reports |
|||
District of Delta |
Report on Flood Protection and Beach Retention, Boundary Bay Village Area, Delta, B.C. |
Associated Engineering Services Ltd. |
Fraser River flood control program
Overview studies relating to the Fraser Valley flood control program |
||
June 18, 1963 |
W.C. Jones |
|
Lower Fraser Valley Dyke Studies Construction Materials Survey (PDF, 3.8MB) |
August 1963 |
E.M. Clark, P.Eng. |
Comprehensive Geotechnical Investigation and Design Report (PDF, 85KB) |
September 1962 to April 1963 |
E.M. Clark, P.Eng. |
May 24, 1968 |
Various |
Glen Valley Diking District
As-constructed dike drawings |
||
Operation and Maintenance Instructions, Glen Valley Diking District, Flood Control Works, As-constructed Drawings |
CBA Engineering Ltd. |
Village of Harrison Hot Springs
As-constructed dike drawings |
||
Village of Harrison Hot Springs, Operation and Maintenance Instructions, Flood Control Works, Volume 3 |
Dayton & Knight |
District of Hope
As-constructed dike drawings |
||
District of Kent, Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Drawings for Dike Improvements, Bank Protection Works and Internal Drainage - Various Locations |
Willis, Cunliffe, Tait & Co., Consulting Engineers |
District of Kent
As- constructed dike drawings |
|||
District of Kent |
District of Kent, Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings for Dike Improvements, Bank Protection Works and Internal Drainage - Various Locations |
Willis, Cunliffe, Tait & Co., Consulting Engineers |
|
District of Kent |
Bateson Pump Station Forcemain Replacement and Post-construction Survey, Kilby Dike |
Civic Consultants & Eaton Land Surveying |
Township of Langley
As-constructed dike drawings |
||
West Langley Dyke Upgrade, Township File No. 3630-D12, November 2001 |
Levelton Engineering Ltd. |
District of Mission
As-constructed dike drawings |
|||
District of Mission |
District of Mission, Operation and Maintenance Instructions, Flood Control Works |
CBA Engineering Ltd. |
|
District of Mission |
Silverdale Dyke, South of Lougheed Highway to West of Chester St. |
|
Mud Bay Diking District
Operation and maintenance​ manuals and as-constructed drawings for City of Surrey, Surrey Diking District, Colebrook Diking District and Mud Bay Diking District |
|||
Colebrook Diking District |
Colebrook Diking District, Serpentine River Flood Control Works, Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
City of Surrey |
District of Surrey, Serpentine River and Crescent Beach Flood Control Works Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
Mud Bay Diking District |
Mud Bay Diking District, Serpentine and Nicomekl Rivers Flood Control Works, Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings, Serpentine and Nicomekl Dams |
Associated Engineering Services Ltd. |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Bridgeview |
Crippen Consultants |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, Volume 4, As-constructed Works for Contract No. 2, Bridgeview and South Westminster |
Crippen Consultants |
|
City of Surrey |
City of Surrey, Operation and Maintenance Instructions, Flood Control Works, Upgrades to Stops Log and Flood Walls, Bridgeview and South Westminster |
Associated Engineering |
|
City of Surrey |
City of Surrey Crescent Beach Flood Mitigation Works, Operation and Maintenance Manual |
Hay & Company Consultants Inc. |
City of New Westminster
As-constructed dike drawings |
|||
City of New Westminster |
City of New Westminster, Queensborough Area, Operation and Maintenance Instructions, Flood Control Works, Volume 3 |
Associated Engineering Services Ltd. |
As-built drawings phase I - Port Royale |
|||
City of New Westminster |
Development at Furness St. and Star Crescent, Queensborough, New Westminster |
Hay & Company Consultants Inc. |
Pemberton Valley Diking District
As-constructed dike drawings |
|||
Pemberton Valley Diking District |
Area 4 Dyke Upgrading, Location Plan, Site Plan and Drawings List |
Kerr Wood Leidal |
As-built drawings phase I - Port Royale |
|||
City of New Westminster |
Development at Furness St. and Star Crescent, Queensborough, New Westminster |
Hay & Company Consultants Inc. |
District of Pitt Meadows
As-constructed dike drawings |
|||
District of Pitt Meadows and Maple Ridge |
Operation and Maintenance Instructions, Flood Control Works, Volume 3 |
Associated Engineering Services Ltd. |
|
District of Pitt Meadows and Maple Ridge |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2 |
Associated Engineering Services Ltd. |
City of Port Coquitlam
As-constructed dike drawings |
|||
District of Coquitlam and the City of Port Coquitlam |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, Part 1: Pitt River Flood Control Works, Part 2: Coquitlam River Flood Control Works |
Crippen Engineering Ltd., Associated Engineering |
Study reports |
|||
City of Port Coquitlam |
Coquitlam River Hydrology Review |
Water Management Consultants |
UMFW 2007 as-built drawings and design reports |
|||
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank |
Associated Engineering |
|
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike |
Associated Engineering |
|
City of Port Coquitlam |
Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pump Station |
Associated Engineering, Golder Associates |
|
City of Port Coquitlam |
Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, Pitt River Dike, Port Coquitlam, B.C. |
Golder Associates |
|
City of Port Coquitlam |
Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, IR#2 and Colony Farms Dike, Pitt River Road, Port Coquitlam, B.C. |
Golder Associates |
City of Richmond
As-constructed dike drawings |
|||
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 1, Sea Dyke Improvements - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 2, South Dyke Improvements, East of Lafarge - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 3, Supply and Supervision of Installation of Pumping Equipment - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 4, North Dyke Improvements, Cambie Road to No. 5 Road - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
Project 3, Contract 5, North Dyke Improvements, Westminster Highway to Cambie Rd - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 6, Supply and Supervision of Installation of Pumping Equipment - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 10, North Dyke Improvements, No 5 Road to No 8 Road - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 12, North Dyke Improvements, No 8 Road to Boundary Road - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
Project 3, Contract 15, South Dyke Improvements, Lafarge to Crown Zellerbach - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 16, South Dyke Improvements, Crown Zellerback to Steveston - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
Project 3, Contract 17, South Dyke - West Sector, Drainage Discharge Structures 26, 27, 28, 29, 30, 32, 33 and 34 - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
Project 3, Contract 18A, Drainage Discharge Structures - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
Project 3, Contract 18B, Drainage Discharge Structures Nos. 14, 15, 18 and 25 - Contract Drawings |
CBA Engineering Ltd. |
|
Richmond |
The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 19, Miscellaneous Dyke Works - Contract Drawings |
CBA Engineering Ltd. |
Other drawings |
|||
Richmond |
Property Composite Plan for Richmond Dikes - Lulu Island |
CBA Engineering Ltd. |
Design reports |
|||
Richmond |
Richmond Dikes Remedial Treatment Oct. 1969 |
Ripley, Klohn & Leonoff International Limited |
District of Squamish
As-constructed dike drawings |
|||
District of Squamish |
Flood Mitigation Works Operation and Maintenance Manual, Volume 2 |
Associated Engineering Services Ltd., Bland Engineering, CBA Engineering Ltd. |
Design reports |
|||
District of Squamish |
Squamish Sea Dyke Upgrade Assessment |
Bland Engineering Ltd. March 1999 |
Flood Hazard Protection Fund 2007-08 as-built drawings |
|||
District of Squamish |
2007-2008 Squamish River Dyke, Bank Protection Works |
Kerr Wood Leidal |
City of Surrey and Surrey Diking District
Operation and maintenance manuals and as-constructed drawings for City of Surrey, Surrey Diking District, Colebrook Diking District and Mud Bay Diking District |
|||
Colebrook Diking District |
Colebrook Diking District, Serpentine River Flood Control Works, Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
City of Surrey |
District of Surrey, Serpentine River and Crescent Beach Flood Control Works, Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
Mud Bay Diking District |
Mud Bay Diking District, Serpentine and Nicomekl Rivers Flood Control Works, Operation and Maintenance Manual |
Dayton & Knight Consulting Engineers |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings, Serpentine and Nicomekl Dams |
Associated Engineering Services Ltd. |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Bridgeview |
Crippen Consultants |
|
City of Surrey |
Operation and Maintenance Instructions, Flood Control Works, Volume 4, As-constructed Works for Contract No. 2, Bridgeview and South Westminster |
Crippen Consultants |
|
City of Surrey |
City of Surrey, Operation and Maintenance Instructions, Flood Control Works, Upgrades to Stops Log and Flood Walls, Bridgeview and South Westminster |
Associated Engineering |
|
City of Surrey |
City of Surrey, Crescent Beach Flood Mitigation Works, Operation and Maintenance Manual |
Hay & Company Consultants Inc. |
Design reports |
|||
City of Surrey |
South Westminster Area Flood Control Works, Report on Final Design First Stage, 11 April 1975 |
Crippen Engineering Ltd. |
UMFW 2007 as-built drawings and completion report for 2007 works |
|||
City of Surrey |
Freshet 2007 Urgent Mitigative Flood Works As-Constructed Report and Drawings |
Associated Engineering |
City of Vancouver
As-constructed dike drawings |
|||
City of Vancouver |
Deering Island Development, Contract No. 2, Shoreline Protection, As-built Drawings, April 1990 |
Hay & Company |
Vancouver Greater Regional District
As-constructed dike drawings |
|||
Vancouver Greater Regional District |
Colony Farm and Pacific Reach Dike Survey, March 2007 |
Coquitlam Engineering & Public Works |
For more information about the Dike Safety Program, please contact the deputy inspector of dikes in your area.