As-built dike drawings and reports

Last updated on August 29, 2023

As-built or as-constructed drawings are submitted for dike construction projects in British Columbia. The tables below provide as-built drawings and significant reports for dikes operated and maintained in the Lower Mainland.

Documents are listed by diking authority and can be identified by publication number, publication title or professional engineering consultant.

 

City of Abbotsford

As-constructed dike drawings

ABB-OM-M-17 (PDF, 770KB)

District of Abbotsford

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Project 8, Contract 5, As-constructed Works - Improvements to Sumas and Vedder Canal Dikes

Crippen Engineering Ltd.

SUM-OM-C-1 (PDF, 2.9MB)

District of Abbotsford

1983-84 Flood Control Program, Contract 1, As-constructed,Upper Sumas River Dyke

Crippen Consultants

SUM-OM-C-2 (PDF, 3.1MB)

District of Abbotsford

1983-84 Flood Control Program, Contract 2, As-constructed, Upper Sumas River Dyke

Crippen Consultants

MAT-OM-M-4 (PDF, 9.8MB)

District of Abbotsford

District of Matsqui, Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Drawings

Associated Engineering Services Ltd.

Fraser River flood control program design reports

R-A1-1-9 (PDF, 1.7MB)

District of Abbotsford

Appendix 4, Abbotsford Project Report on First Stage, Final Design, Subsurface Investigation for Vedder Canal and Lower Sumas Dikes

Vedder River management area plan

Vedder Mgmt Pl (PDF, 2.2MB)

Corporation of the District of Chilliwack

Vedder River Management Area Plan, Sept 1983

UMFW 2007 as-built drawings and completion report for 2007 works

UMFW 2007 Abb Comp Rpt (PDF, 5.7MB)

District of Abbotsford

Completion Report for Matsqui and Vedder Dike Upgrades

Golder Associates Ltd.

UMFW 2007 James Tr Plnt (PDF, 4.2MB)

District of Abbotsford

James Treatment Plant Dyke Construction, 5959 Gladwin Road

Golder Associates Ltd.

UMFW 2007 Matsqui Dwgs (PDF, 7.8MB)

District of Abbotsford

Matsqui Dyke 2007 Upgrade

Golder Associates Ltd.

UMFW 2007 Vedder Dwgs (PDF, 3.9MB)

District of Abbotsford

2007 Vedder Dyke Upgrade, Barrowtown to Keith Wilson

Golder Associates Ltd.

 

Albion District

UMFW 2007 as-built drawings and design report for Albion Dike

07-02-02B Rpt (PDF, 2.3MB)

Albion

Design Brief, Dike Repair Works, Stn 1+000 to 3+060 Albion Dike River Road, Opposite Tamarack Lane, Maple Ridge B.C.

Geo Media Engineering Ltd. April 2007

ALBION DYKE UMFW 2007 (PDF, 340KB)

Albion

As-built drawings for Albion Dike

Corporation of the District of Maple Ridge November 2007

 

City of Chilliwack

Overview studies relating to the City of Chilliwack flood control program

CHI-OM-M-5 (PDF, 52MB)

The Corporation of the District of Chilliwack

Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Improvements to East Dike, West Dike, Internal Drainage and Bank Protection - Various Locations

Willis, Cunliffe, Tait & Co., Dayton & Knight Ltd., Crippen Engineering Ltd., Bland Engineering Ltd., JW Wedler & Assoc.

Fraser River flood control program design reports

2290-W (PDF, 2.9MB)

The Corporation of the District of Chilliwack

Vedder Setback Dykes Geotechnical Report

Hillis Consulting Services, Nov 1978

W-2703 (PDF, 16.3MB)

The Corporation of the District of Chilliwack

Chilliwack Flood Protection Dykes Upgrade, Geotechnical Report, Chilliwack B.C.

AMEC Earth & Environmental Ltd.

Vedder River management area plan

Vedder Mgmt Pl (PDF, 2.2MB)

The Corporation of the District of Chilliwack

Vedder River Management Area Plan, Sept. 1983

The Vedder River Management Committee

UMFW 2007 as-built drawings for East Dyke and Wing Dyke upgrades

Chilliwack UMFW 2007 (PDF, 3.3MB) 

The Corporation of the District of Chilliwack

East Dyke and Wing Dyke Upgrades, 2007 Construction

Dayton & Knight Ltd. Consulting Engineers

 

City of Coquitlam

Fraser River flood control program as-constructed drawings

COQ-OM-M-4 (PDF, 30MB)

District of Coquitlam City of Port Coquitlam

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2 As-constructed Drawings Part 1: Pitt River Flood Control Works, Part 2: Coquitlam River Flood Control Works

Crippen Engineering Ltd., Associated Engineering

Study reports

W-2805 (PDF, 6.2MB)

City of Port Coquitlam

Coquitlam River Hydrology Review

Water Management Consultants

UMFW 2007 as-built drawings and design reports

Coquitlam R Left Bank Dwgs (PDF, 1.8MB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank

Associated Engineering

Pitt R Right Bank Dwgs (PDF, 1.8MB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike

Associated Engineering

Harbour St Stn & Valiant Sort (PDF, 745KB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pump Station

Associated Engineering, Golder Associates

Pitt R Dike Geot (PDF, 7.7MB)

City of Port Coquitlam

Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works Pitt River Dike, Port Coquitlam B.C.

Golder Associates

Colony FM Geot (PDF, 4.8MB)

City of Port Coquitlam

Geotechnical Assessment Freshet 2007 Urgent Flood Mitigation Works IR#2 and Colony Farms Dike, Pitt River Road, Port Coquitlam B.C.

Golder Associates

 

Colebrook Diking District

Operation and maintenance manuals and as-constructed drawings for City of Surrey, Surrey Diking District, Colebrook Diking District and Mud Bay Diking District

SUR-OM-M-1 (PDF, 1.7MB)

Colebrook Diking District

Colebrook Diking District Serpentine River Flood Control Works Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-2 (PDF, 2.6MB)

City of Surrey

District of Surrey Serpentine River and Crescent Beach Flood Control Works Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-4 (PDF, 1.4MB)

Mud Bay Diking District

Mud Bay Diking District Serpentine and Nicomekl Rivers Flood Control Works Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-5 (PDF, 4.7MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings, Serpentine and Nicomekl Dams 

Associated Engineering Services Ltd.

SUR-OM-M-6 (PDF, 10.2MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Bridgeview

Crippen Consultants

SUR-OM-M-7 (PDF, 9.8MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, Volume 4, As-constructed Works for Contract No. 2, Bridgeview and South Westminster

Crippen Consultants

SUR-OM-M-8 (PDF, 31.1MB)

City of Surrey

City of Surrey, Operation and Maintenance Instructions, Flood Control Works, Upgrades to Stops Log and Flood Walls, Bridgeview and South Westminster 

Associated Engineering 

FPAF-00-02-42 (PDF, 2.5MB)

City of Surrey

City of Surrey, Crescent Beach Flood Mitigation Works, Operation and Maintenance Manual 

Hay & Company Consultants Inc.

Design reports

R-S4-1-4 (PDF, 4.7MB)

City of Surrey

South Westminster Area Flood Control Works Report on Final Design First Stage

Crippen Engineering Ltd., 11 April 1975

UMFW 2007 as-built drawings and completion report for 2007 works

South Westminster Rpt (PDF, 4.89MB)

City of Surrey

Freshet 2007 Urgent Mitigative Flood Works As-constructed Report and Drawings

Associated Engineering

 

Coquitlam Diking District

Fraser River flood control program as-constructed drawings

COQ-OM-M-4 (PDF, 28.5MB)

District of Coquitlam City of Port Coquitlam

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2, As-constructed Drawings Part 1: Pitt River Flood Control Works, Part 2: Coquitlam River Flood Control Works

Crippen Engineering Ltd., Associated Engineering

Study reports

W-2805 (PDF, 6.2MB)

City of Port Coquitlam

Coquitlam River Hydrology Review

Water Management Consultants

UMFW 2007 as-built drawings and design reports

Coquitlam R Left Bank Dwgs (PDF, 1.8MB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank

Associated Engineering

Pitt R Right Bank Dwgs (PDF, 1.8MB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike

Associated Engineering

Harbour St Stn & Valiant Sort (PDF, 745KB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pump Station

Associated Engineering, Golder Associates

Pitt R Dike Geot (PDF, 7.7MB)

City of Port Coquitlam

Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, Pitt River Dike, Port Coquitlam, B.C.

Golder Associates

Colony FM Geot (PDF, 4.8MB)

City of Port Coquitlam

Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, IR#2 and Colony Farms Dike, Pitt River Road, Port Coquitlam, B.C.

Golder Associates

 

Corporation of Delta

Fraser River flood control program as-constructed drawings

DEL-OM-M-3 (PDF, 36.4MB)

District of Delta

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 1, As-constructed Drawings, Contracts 1, 2, 4, 6, 6A, 6B, 7, 9, 9A, 9B 

Associated Engineering Services Ltd.

DEL-OM-M-4 (PDF, 32.3MB)

District of Delta

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2, As-constructed Drawings, Contracts 12, 15A, 18, 20 22, 23, Westham Island (Contracts 1 and 2)

Associated Engineering Services Ltd.

Design reports

R-D1-1-10 (PDF, 4.3MB)

District of Delta

Report on Flood Protection and Beach Retention, Boundary Bay Village Area, Delta, B.C.

Associated Engineering Services Ltd.

 

Fraser River flood control program

Overview studies relating to the Fraser Valley flood control program

Stability of the Lower Fraser Valley Dykes (PDF, 625KB)

June 18, 1963

W.C. Jones

Lower Fraser Valley Dyke Studies Construction Materials Survey (PDF, 3.8MB)

August 1963

E.M. Clark, P.Eng.

Comprehensive Geotechnical Investigation and Design Report (PDF, 85KB)

September 1962 to April 1963

E.M. Clark, P.Eng.

Fraser River Upstream Storage Review Report (PDF, 9.6MB)

May 24, 1968

Various

 

Glen Valley Diking District

As-constructed dike drawings

GLE-OM-M-2 (PDF, 8.2MB)

Operation and Maintenance Instructions, Glen Valley Diking District, Flood Control Works, As-constructed Drawings 

CBA Engineering Ltd. 

 

Village of Harrison Hot Springs

As-constructed dike drawings

HAR-OM-M-2 (PDF, 3.9MB)

Village of Harrison Hot Springs, Operation and Maintenance Instructions, Flood Control Works, Volume 3

Dayton & Knight

 

District of Hope

As-constructed dike drawings

KEN-OM-M-3 (PDF, 780KB)

District of Kent, Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Drawings for Dike Improvements, Bank Protection Works and Internal Drainage - Various Locations

Willis, Cunliffe, Tait & Co., Consulting Engineers 

 

District of Kent

As- constructed dike drawings

KEN-OM-M-3 (PDF, 17MB)

District of Kent

District of Kent, Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings for Dike Improvements, Bank Protection Works and Internal Drainage - Various Locations

Willis, Cunliffe, Tait & Co., Consulting Engineers

Kent UMFW 2007 (PDF, 1.MB)

District of Kent

Bateson Pump Station Forcemain Replacement and Post-construction Survey, Kilby Dike

Civic Consultants & Eaton Land Surveying

 

Township of Langley

As-constructed dike drawings

LAN-0M-M-1 (PDF, 1MB)

West Langley Dyke Upgrade, Township File No. 3630-D12, November 2001

Levelton Engineering Ltd.

 

District of Mission

As-constructed dike drawings

MIS-OM-M-2 (PDF, 1.1MB)

District of Mission

District of Mission, Operation and Maintenance Instructions, Flood Control Works

CBA Engineering Ltd.

UMFW 2007 Silverdale Dike (PDF)

District of Mission

Silverdale Dyke, South of Lougheed Highway to West of Chester St.

 

 

Mud Bay Diking District

Operation and maintenance​ manuals and as-constructed drawings for City of Surrey, Surrey Diking District, Colebrook Diking District and Mud Bay Diking District

SUR-OM-M-1 (PDF, 1.7MB)

Colebrook Diking District

Colebrook Diking District, Serpentine River Flood Control Works, Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-2 (PDF, 2.6MB)

City of Surrey

District of Surrey, Serpentine River and Crescent Beach Flood Control Works Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-4 (PDF, 1.4MB)

Mud Bay Diking District

Mud Bay Diking District, Serpentine and Nicomekl Rivers Flood Control Works, Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-5 (PDF, 4.7MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings, Serpentine and Nicomekl Dams 

Associated Engineering Services Ltd.

SUR-OM-M-6 (PDF, 9.8MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Bridgeview

Crippen Consultants

SUR-OM-M-7 (PDF, 9.8MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, Volume 4, As-constructed Works for Contract No. 2, Bridgeview and South Westminster

Crippen Consultants

SUR-OM-M-8 (PDF, 31.1MB)

City of Surrey

City of Surrey, Operation and Maintenance Instructions, Flood Control Works, Upgrades to Stops Log and Flood Walls, Bridgeview and South Westminster 

Associated Engineering 

FPAF-00-02-42 (PDF, 2.5MB)

City of Surrey

City of Surrey Crescent Beach Flood Mitigation Works, Operation and Maintenance Manual 

Hay & Company Consultants Inc.

 

City of New Westminster

As-constructed dike drawings

NEW-OM-M-2 (PDF, 14.4MB)

City of New Westminster

City of New Westminster, Queensborough Area, Operation and Maintenance Instructions, Flood Control Works, Volume 3

Associated Engineering Services Ltd.

As-built drawings phase I - Port Royale

Port Royal Phase 1 (PDF, 1.7MB)

City of New Westminster

Development at Furness St. and Star Crescent, Queensborough, New Westminster

Hay & Company Consultants Inc.

 

Pemberton Valley Diking District

As-constructed dike drawings

PEM-OM-C-1 (PDF, 1.4MB)

Pemberton Valley Diking District

Area 4 Dyke Upgrading, Location Plan, Site Plan and Drawings List

Kerr Wood Leidal

As-built drawings phase I - Port Royale

Port Royal Phase 1 (PDF, 1.7MB)

City of New Westminster

Development at Furness St. and Star Crescent, Queensborough, New Westminster

Hay & Company Consultants Inc.

 

District of Pitt Meadows

As-constructed dike drawings

PIT-OM-M-4 (PDF, 31.5MB)

District of Pitt Meadows and Maple Ridge

Operation and Maintenance Instructions, Flood Control Works, Volume 3

Associated Engineering Services Ltd.

PIT-OM-M-5 (PDF, 11MB)

District of Pitt Meadows and Maple Ridge

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Book 2

Associated Engineering Services Ltd.

 

City of Port Coquitlam

As-constructed dike drawings

COQ-OM-M-4 (PDF, 28.5MB)

District of Coquitlam and the City of Port Coquitlam

Operation and Maintenance Instructions, Flood Control Works, Volume 3, Part 1: Pitt River Flood Control Works, Part 2: Coquitlam River Flood Control Works

Crippen Engineering Ltd., Associated Engineering

Study reports

W-2805 (PDF, 6.2MB)

City of Port Coquitlam

Coquitlam River Hydrology Review

Water Management Consultants

UMFW 2007 as-built drawings and design reports

Coquitlam River Left Bank Dwgs (PDF, 1.8MB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Coquitlam River Left Bank

Associated Engineering

Pitt R Right Bank Dwgs (PDF, 1.7MB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike

Associated Engineering

Harbour St Stn & Valiant Sort (PDF, 745KB)

City of Port Coquitlam

Urgent Flood Mitigation Works (2007) Pitt River Right Bank Dike at Valiant Log Sort and Harbour Street Pump Station

Associated Engineering, Golder Associates

Pitt R Dike Geot (PDF, 7.7MB)

City of Port Coquitlam

Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, Pitt River Dike, Port Coquitlam, B.C.

Golder Associates

Colony FM Geot (PDF, 4.8MB)

City of Port Coquitlam

Geotechnical Assessment Freshet 2007, Urgent Flood Mitigation Works, IR#2 and Colony Farms Dike, Pitt River Road, Port Coquitlam, B.C.

Golder Associates

 

City of Richmond

As-constructed dike drawings

OM-C-1 (PDF, 1.6MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 1, Sea Dyke Improvements - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-2 (PDF, 1.5MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 2, South Dyke Improvements, East of Lafarge - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-3 (PDF, 1.2MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 3, Supply and Supervision of Installation of Pumping Equipment - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-4 (PDF, 15.3MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 4, North Dyke Improvements, Cambie Road to No. 5 Road - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-5 (PDF, 18.3MB)

Richmond

Project 3, Contract 5, North Dyke Improvements, Westminster Highway to Cambie Rd - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-6 (PDF, 1.4MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 6, Supply and Supervision of Installation of Pumping Equipment - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-10 (PDF, 2.2MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 10, North Dyke Improvements, No 5 Road to No 8 Road - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-12 (PDF, 4.1MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 12, North Dyke Improvements, No 8 Road to Boundary Road - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-15 (PDF, 6.8MB)

Richmond

Project 3, Contract 15, South Dyke Improvements, Lafarge to Crown Zellerbach - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-16 (PDF, 4.3MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 16, South Dyke Improvements, Crown Zellerback to Steveston - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-17 (PDF, 15MB)

Richmond

Project 3, Contract 17, South Dyke - West Sector, Drainage Discharge Structures 26, 27, 28, 29, 30, 32, 33 and 34 - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-18A (PDF, 10.4MB)

Richmond

Project 3, Contract 18A, Drainage Discharge Structures - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-18B (PDF, 10.8MB)

Richmond

Project 3, Contract 18B, Drainage Discharge Structures Nos. 14, 15, 18 and 25 - Contract Drawings

CBA Engineering Ltd.

RIC-OM-C-19 (PDF, 1.2MB)

Richmond

The Township of Richmond, Canada-British Columbia Fraser River Flood Control 1968 Agreement, Project No. 3, Contract No. 19, Miscellaneous Dyke Works - Contract Drawings

CBA Engineering Ltd.

Other drawings

Comp-Plan (PDF, 8.6MB)

Richmond

Property Composite Plan for Richmond Dikes - Lulu Island

CBA Engineering Ltd.

Design reports

R-R3-1-1 (PDF, 13.6MB)

Richmond

Richmond Dikes Remedial Treatment Oct. 1969

Ripley, Klohn & Leonoff International Limited

 

District of Squamish

As-constructed dike drawings

SQU-OM-C-1 (PDF, 10.8MB)

District of Squamish

Flood Mitigation Works Operation and Maintenance Manual, Volume 2

Associated Engineering Services Ltd., Bland Engineering, CBA Engineering Ltd.

Design reports

W2651 (PDF, 1.8MB)

District of Squamish

Squamish Sea Dyke Upgrade Assessment

Bland Engineering Ltd. March 1999

Flood Hazard Protection Fund 2007-08 as-built drawings

FHPF2007-08 (PDF, 565KB)

District of Squamish

2007-2008 Squamish River Dyke, Bank Protection Works

Kerr Wood Leidal

 

City of Surrey and Surrey Diking District

Operation and maintenance manuals and as-constructed drawings for City of Surrey, Surrey Diking District, Colebrook Diking District and Mud Bay Diking District

SUR-OM-M-1 (PDF, 1.7MB)

Colebrook Diking District

Colebrook Diking District, Serpentine River Flood Control Works, Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-2 (PDF, 2.6MB)

City of Surrey

District of Surrey, Serpentine River and Crescent Beach Flood Control Works, Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-4 (PDF, 1.4MB)

Mud Bay Diking District

Mud Bay Diking District, Serpentine and Nicomekl Rivers Flood Control Works, Operation and Maintenance Manual

Dayton & Knight Consulting Engineers

SUR-OM-M-5 (PDF, 4.7MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, As-constructed Drawings, Serpentine and Nicomekl Dams 

Associated Engineering Services Ltd.

SUR-OM-M-6 (PDF, 5.7MB)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, Volume 3, As-constructed Works, Bridgeview

Crippen Consultants

SUR-OM-M-7 (PDF, 9.8)

City of Surrey

Operation and Maintenance Instructions, Flood Control Works, Volume 4, As-constructed Works for Contract No. 2, Bridgeview and South Westminster

Crippen Consultants

SUR-OM-M-8 (PDF, 31.1MB)

City of Surrey

City of Surrey, Operation and Maintenance Instructions, Flood Control Works, Upgrades to Stops Log and Flood Walls, Bridgeview and South Westminster 

Associated Engineering 

FPAF-00-02-42 (PDF, 2.5MB)

City of Surrey

City of Surrey, Crescent Beach Flood Mitigation Works, Operation and Maintenance Manual 

Hay & Company Consultants Inc.

Design reports

R-S4-1-4 (PDF, 4.8MB)

City of Surrey

South Westminster Area Flood Control Works, Report on Final Design First Stage, 11 April 1975

Crippen Engineering Ltd.

UMFW 2007 as-built drawings and completion report for 2007 works

South Westminster Rpt (PDF, 4.9MB)

City of Surrey

Freshet 2007 Urgent Mitigative Flood Works As-Constructed Report and Drawings

Associated Engineering 

 

City of Vancouver

As-constructed dike drawings

VCR-OM-C-2 (PDF, 4.4MB)

City of Vancouver

Deering Island Development, Contract No. 2, Shoreline Protection, As-built Drawings, April 1990

Hay & Company

 

Vancouver Greater Regional District

As-constructed dike drawings

Colony Farm (PDF, 10.7MB)

Vancouver Greater Regional District

Colony Farm and Pacific Reach Dike Survey, March 2007

Coquitlam Engineering & Public Works

 

Contact information

For more information about the Dike Safety Program, please contact the deputy inspector of dikes in your area.