This activity requires that a mapping standard, an overall standard (FS1001), and an activity-specific standard be followed.
Where an Overstorey Removal Project requires Access considerations, additional standards identified on the Access web page will need to be entered into PINES.
When a Danger Tree Assessment is required as part of an Overstorey Removal Project, additional standards identified in the FFT Danger Tree Assessment Activity will need to be entered into PINES.
In order to ensure that FFT harvest opportunities are advertised to attract as many qualified harvesting contractors as possible, the procedures in the document below must be followed.
If this activity occurs in a declared and known area that impacts a species or ecosystem at risk, an identified wildlife species, or a regionally important species, the applicant must indicate in their PINES submission the specific species/ecosystem and have available, on request, the location of recovery plans and/or other documents that detail the protective measures to be taken.
By downloading these documents you have waived the Ministry/Province from any liability and save harmless the Ministry/Province from the use of the these contract documents.