Permittees are required to submit Annual Reclamation Reports in compliance with their Mines Act permits and the Health, Safety and Reclamation Code for Mines in British Columbia.
The intent of the annual reclamation report is to provide a summary of all activities conducted on the mine property over the previous year. Specifically, the report must outline the following:
The annual reclamation report must also provide a projection of mining and reclamation activities planned for the next 5 years.
Report information is required to be in a specific format. Please review the Annual Reclamation Report Requirement (PDF, 223KB) prior to submitting your report. The format provided here is inclusive, so some components may not be relevant to all mine sites.
Submission of hardcover copies of the annual reclamation report are no longer required
Geospatial files are required to be submitted with all Annual Reclamation Reports for each mine. Geospatial file and data standards streamline submission requirements.
The following tables must also be completed, if applicable for the site (Cover Letter Summary Table and Table 1 are minimum requirements), and submitted with your annual reclamation report:
Provide a detailed estimate of the total expected costs of outstanding reclamation obligations of the mine, including all long-term costs for monitoring, maintenance, and water treatment.
Development of Reclamation Liability Cost Estimates are to follow:
Proponents are remined that estimated costs should be calculated over the next 100 years. Clearly indicate estimated liability costs associated with work completed under Notice of Departures for the year.
If the detailed cost estimates are expected to be filed as a separate confidential report, please clearly specify in the report cover letter. The total reclamation liability estimated for the site should still be provided in the Cover Letter Summary Table.