B.C. Bridge Standards & Procedures Manual Updates

Last updated on August 19, 2022

This page explains major revisions to sections within the Bridge Standards & Procedures Manual.

Document

Update Instructions

Date Issued

Updates to Bridge Standards & Procedures Manual.
Volume 1 The ministry supplement to CHBDC S6:19 replaces the ministry supplement to CHBDC S6-14 and is effective for design assignments that are initiated after July 27, 2022. 2022-07-27
Volume 3 Replaced Standard Bridge Parapet Steel Bicycle Railing  with  2785-3d 2022-01-31
Volume 2 Updated the Support Files - Autocad wtih a new BC MoT Bridge.ctb file 2021-05-12
Volume 3 Updated Standard Bridge Parapet Steel Bicycle Railing – 2785-3  and moved 1995 version to the archived section. 2021-02-18
Volume 2 Procedures & Directions and the Autocad support documents have been updated. 2019-02-19

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contact information

Contact us for information about structural engineering.

Email:
ENG.Admin@gov.bc.ca

Mailing
PO Box 9850 Stn Prov Govt Victoria BC V8W 9T5