Tank Hill project is located 14 km east of Lytton.

Overview of the project

Tank Hill

  • Reinstate a grade separation between the TransCanada Highway and CPKC Rail
  • Highway construction to accommodate grade separation.
  • Structure crossing of existing creek, including channel improvements
  • Improved drainage from CPKC rail under TransCanada Highway

Status

  • In construction, on schedule

  • Single lane alternating traffic. Please obey all signage

  • 20-minute closures for rock scaling are now complete

  • Traffic control setup and site conditions are continually reviewed to improve traffic safety and mobility

  • The project team is proactively coordinating with CPKC rail to reduce delays

Project benefits

  • Improved safety and reliability
  • Improve climate resiliency
  • Opportunity for local communities and businesses

Conceptual design

Artist rendering of conceptual design

Artist rendering of concept design for Tank Hill

Photo gallery

Contact information

Friendly Url for this Page:
gov.bc.ca/TankHill

For information about this project, contact

Brian Taylor
Project Manager