2015 Interim Traffic Management Manual for Work on Roadways - Updates

Last updated on October 22, 2018

This page explains major revisions to chapters or sections within the 2015 Interim Traffic Management Manual for Work on Roadways. Updates may include new or revised guidelines, errata corrections and may incorporate previously issued Technical Bulletins.

Document

Update

Date Issued

Updates to 2015 Interim Traffic Management Manual for Work on Roadways
Appendix C
  • Templates for Traffic Management Plans included as a separate Word document as a useful tool for industry.
2017-06-01

Appendix G

  • Appendix G in effect starting Feburary 2017

2017-02-17

Traffic Control Layouts
  • Updated sections 6 to 19. Updated format, improved clarity, updated content and added new information.

2017-02-15

Appendices A-F
  • Updated Appendices A-F. Updated and expanded information, improved clarity,

2016-04-11

Overview

2016-02-17

Frontice

  • Updated acknowledgements and Section 1

2016-02-15

Part A

  • Updated Sections 2 and 3. Improved clarity and categorization.

2016-02-15

Part B

  • Updated Sections 4 and 5. Improved clarity and added information.

2016-02-15

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Contact information

Contact us for information about traffic management.

Email:
ENG.Admin@gov.bc.ca

Mailing
PO Box 9850 Stn Prov Govt Victoria BC V8W 9T5