Step 5 - Opportunity close

Last updated on February 27, 2024

Step 5 - Closing RFx, Submitting on behalf, Unsealing, Viewing Submissions, Analyze

Instructions

Follow the instructions in the sections below.

 

Manual Close of Opportunity

bcbid_guides_ministry_manual_close_1

Click to enlarge image

1. In the left-hand menu, click Prepare RFx.
2. Click the Other Actions dropdown button.
3. Click Close Opportunity.

This section is here for training to allow trainers to upload Submissions during practice.

Manually Closing a Posted Opportunity

info alert

Manual closure of opportunities is available and should be used in accordance with core policy and best practices. This function is not recommended for use.

 

bcbid_guides_ministry_manual_close_2

Click to enlarge image

4. Click OK.

 

Upload Submissions

bcbid_guides_ministry_upload_submissions_1

Click to enlarge image

Submissions that are only to be viewed after Closing Date and Time, are uploaded after the Opportunity is closed.

1.    Using the left-hand menu, click View RFx Activity.
2.    Select the Declined checkbox to track all invited Suppliers who did not provide a Submission.
3.    Click the + button in the row of the Supplier whose Submission is being added.
4.    Click the Refresh button to update the Submission Available Confirm with “Refresh” column. 

info alert

The Responsible must upload Submissions to BC Bid for any Opportunity that is not accepting BC Bid Electronic Submissions. Submissions must be uploaded to award, shortlist or not award and to create a Contract Award Notice.

Note: To add Suppliers to the View RFx tab see Adding Suppliers Not On Qualified List.

 

Submissions on Behalf of Suppliers

bcbid_guides_ministry_upload_submissions_2

Click to enlarge image

    a. Select a date and time under Offline Submission Receipt
    Note:
Offline submission receipt dates and times entered during the unverified bid results process will auto-populate when entering subsequent hardcopy submissions.
    b. Click the Click or Drag to add files button or drag a file to upload a Submission.
    Note: document count field will detail the number of documents attached to the submission
5. Click Submit.

bcbid_guides_ministry_upload_submissions_3

Click to enlarge image

6. Click I Agree and Submit.

bcbid_guides_ministry_upload_submissions_4

Click to enlarge image

info alertAs a Buyer you are not agreeing to this pop-up advisory. It’s a step required to upload a Submission into BC Bid for creation of the contract award notice within your Opportunity.

 

7. Click Save and Close

 

Unseal Submissions

Before unsealing Submissions ensure that all Submissions have been uploaded to the Opportunity. See Upload Submissions. 

bcbid_guides_ministry_unseal_submissions 

Click to enlarge image

1. In the left-hand menu, click Prepare RFx, then navigate to the Setup tab.
2. Within Sealed Submissions, click the padlock icon to unseal submissions.

Note: A pop-up will display before unsealing submissions with the following:

‘Have you uploaded ALL offline Submissions into BC Bid? If not, click CANCEL. If you click OK, you will no longer be able to upload offline Submissions. Once unsealed, offline Submissions cannot be uploaded. Please refer to your Buyer Guide for full instructions.’

info alertFor Opportunities that do not have sealed submissions, see Step 6 – Analyze and Award.

 

 

Unsealing and Downloading Submissions