Hope Slough

Last updated on September 13, 2024

Image from Hope Slough

Area: Chilliwack

Preliminary site assessment identified hydraulic capacity, access constraints and potential flooding concerns near the joining of Sqwa:la (Hope Slough) and Stó:lō (Fraser River) area west of Chilliwack, BC. 

Sqwa:la (Hope Slough) flows to the Stó:lō (Fraser River) and is fed by the Hope River, which also connects to the Stó:lō (Fraser River) approximately 12km upstream from the mouth of the slough.

The slough has seen a historic accumulation of sediment, especially at its connection with the Stó:lō (Fraser River), that was increased by the November 2021 ARE. Sqwa:la (Hope Slough) is typically 80–90 meters wide and narrows to only 20 meters wide at the outflow.

This deposition of sediment may cause additional damage to riverbeds, banks, and infrastructure, and may pose a significant threat to the safety of people, properties, infrastructure, and the environment. 

Planned work on this site includes reducing the amount of sediment along the channel towards the connection with the Stó:lō (Fraser River) to improve channel capacity along the project site area. (See map below). 

Map of the project area.

Project Details

Total Budget:

$1,800,000

Projected Completion Date:

October 2024

Communities & Taskforce Members

Hope Slough map

Videos

 

Spring

 

Active bank erosion

Images

April 2024 site tour

Looking down the Sqwa:la (Hope Slough). Image above: Looking down the Sqwa:la (Hope Slough). 

looking towards the Stó:lō (Fraser River).Image above: looking towards the Stó:lō (Fraser River).

Sqwa:la (Hope Slough) where sediment removal is needed.Image above: Sqwa:la (Hope Slough) where sediment removal is needed.

Sqwa:la (Hope Slough) looking out from picnic shelter.Image above: Sqwa:la (Hope Slough) looking out from picnic shelter.

 

January 2024 Site Tour

Hope Slough showing active bank erosion. Image above: Sqwa:la (Hope Slough) showing active bank erosion. 

Sediment flowing into the Stó:lō (Fraser River) causing a difference in water colour. Image above: Sediment flowing into the Stó:lō (Fraser River) causing a difference in water colour. 

Hope Slough Joining the Stó:lō (Fraser River)Image above: Sqwa:la (Hope Slough) Joining the Stó:lō (Fraser River)

Picnic shelter on the bank of the Hope Slough. Image above: Picnic shelter on the bank of the Sqwa:la (Hope Slough). 

Risk Evaluation

 

Public Health and Safety

Reduction of the Sloughs flow capacity due to sediment accumulation at the mouth may increase the likelihood of flooding and cause moderate disruption to communities situated along its banks.

 

River Capacity

Overbank flooding at Sqwa:la (Hope Slough), especially along Lower Landing Road and Teathquathil Road. occurs during periods of high Stó:lō (Fraser River) level in spring and summer and is relatively rare during the fall. Reduction of the Sloughs flow capacity due to sediment accumulation at the mouth may increase the likelihood of flooding.

 

Environmental

Sediment build-up in Sqwa:la (Hope Slough) degrades the quality of resting and rearing fish habitat in the channel. Fish may also be less apt to enter the Slough during low flow months if sediment accumulation impedes fish access. Reduced flow depths due to sediment accumulation also negatively impact's Skwah First Nation's ability to navigate the Slough, both for fishing and other traditional activities like canoe races.

 

Infrastructure

No at-risk infrastructure was identified during the site visit. 

 

 

Contact information

Information Officer
sec.info.epd@gov.bc.ca