Aerial view of clean up on Higway 7 at Seabird Bluff

Work continues on Highway 7. Find out about current road status.

Location

  • Highway 7 - Coquitlam to Hope

Conditions

  • Highway 7 is currently open without restrictions.
  • Check DriveBC for conditions and events that may be affecting Highway 7

Status

Seabird Bluff Slide

  • Short term works were completed in August 2022
  • Long Term Works Schedule
    • 100% Detail Design - March 2023
    • Tender - Spring 2023
    • Construction - Summer 2023 - Fall 2023

Highway 7 surrounding area/side roads

  • Sterling road erosion works are currently substantially completed as of January 2023. Paving, pocket planting and tree planting are expected during Spring 2023 to  complete the project.