B.C. Highway Flood Recovery Projects - Sunshine Coast

Last updated on September 12, 2024

Sunshine Coast Flood Recovery Map showing location of Trout Lake, Redroofs Road Washout, Day Road at Clack Creek Washout, Day Road at Gough Creek Washout, Margaret Road Washout and Beach Avenue Washout

Work continues, repairing and increasing the resiliency of locations on the Sunshine Coast that were affected by the November 2021 atmospheric river event. Permanent repairs construction began in summer 2024 and is anticipated to be completed by November 30, 2024.

From November 13 to 15, 2021, a heavy rainstorm known as an atmospheric river event caused extensive damage to highway infrastructure, including several roads and culverts on the Sunshine Coast, including the following three project sites:


Kenyon Creek

Put alternative text to describe image in info box

  • Redrooffs Road Culvert (crossing at Cove Beach Road)

Flume Creek

Put alternative text to describe image in info box

  • Margaret Road Culvert
  • Beach Avenue Culvert

Day Road 

Put alternative text to describe image in info box

  • ​Day Road at Gough Creek
  • Day Road at Clack Creek

Photo Gallery

Contact information

Friendly Url for this Page:
gov.bc.ca/sunshine-coast-recovery-projects

For more information contact:

Lower Mainland District Phone
1-604-527-2221