Highway 8 - Sites 11-15

Last updated on November 4, 2024

BC Highway 8 map showing sites 11-5

Sites 11 to 15 are located between 9.1 to 12 km east of Spences Bridge.

Overview of the project 

The project will include:

  • Design and construction of permanent road surfaces
  • Line painting and concrete barrier installation
  • Strengthening of the road embankment to protect the highway from erosion
  • Environmental enhancements

Status

  • Planning and design are underway
  • Construction will begin in 2025

Project benefits

  • These repairs will improve safe access for residents and enhance highway’s climate resiliency for future weather-related events
  • Environmental enhancements to improve wildlife habitat and increase vegetation

Photo gallery

Site 11 (12 km east of Spences Bridge)

November 2021

Site 11 in November 2021

November 2022

Site 11 in November 2022

Site 12 (11.3 km east of Spences Bridge)

November 2021

Site 12 in November 2021

November 2022

Site 12 in November 2022

Site 13 (10.8 km east of Spences Bridge)

November 2021

Site 13 in November 2021

November 2022

Site 13 in November 2022

Site 14 (9.8 km east of Spences Bridge)

November 2021

Site 14 in November 2021

November 2022

Site 14 in November 2022

Site 15 (9.1 km east of Spences Bridge)

November 2021

Site 15 in November 2021

November 2022

Site 15  in November 2022

 

Contact information

For more information contact:
General Enquiries