Highway 8 - Sites 20-22

Last updated on September 20, 2024

BC Highway 8 map showing sites 20-22

Sites 20 to 22 are located at 3 Mile Bridge, Rattlesnake Bridge and Curnow Bridge.

Overview of the project 

The project will include:

  • Design and construction of the permanent road base and bridge approaches
  • Bridge foundation improvements at Site 22 (Curnow Bridge)
  • Drainage improvements
  • Rip-rap (large rock) armouring to protect the bridge approaches from erosion

Status

  • Planning and design work is underway
  • Construction will begin in winter 2024

Project benefits

These repairs will improve the reliability and resilience of the highway and bridges

Photo gallery

Site 20 (3 Mile Bridge)

December 2021

Site 20 in December 2021

April 2022

Site 20 in April 2022

Site 21 (Rattlesnake Bridge)

December 2021

Site 21 in December 2021

October 2022

Site 21 in October 2022

Site 22 (Curnow Bridge)

December 2021

Site 22 in December 2021

November 2022

Site 22 in November 2022

 

Contact information

For more information contact:
General Enquiries