Highway 7 Widening - 266th St. to 287th St.

Last updated on July 24, 2024

Highway 7 at River Road

This project will upgrade a four-kilometre segment of Highway 7 between Maple Ridge and Mission. It will widen from 266th Street to 287th Street in Maple Ridge from an undivided two-lane highway to four lanes.

Over 24,000 vehicles travel on Highway 7 each day. Safety and efficiency are concerns on this busy east-west connector.

Along with being an important community link, the route is well-used for tourism, business activities, and movement of goods related to port and rail.

Investing in infrastructure upgrades is important to help increase safety, capacity, reliability, and efficiency for all road users between the communities of Maple Ridge and Mission and beyond.

Project Cost

The project budget is $130.19 million, with contributions from:

  • Province of British Columbia: $100.98 million
  • Government of Canada: $29.21 million

Status

The project is currently in construction.

  • The major contractor is M2K Construction.
  • Construction started in December 2022 and completion is expected in fall 2024. 
  • Utility relocation started in May 2023 and is ongoing. 
  • The turn-around at approximately 263rd south of Highway 7 (west end) is built and paved (see below Photo #1).  The turn-around at 287th (east end) is also graded (see below Photo #2).  Both turn-arounds are key to facilitate the next steps of traffic management for construction. 
  • Rock work ongoing near the 272nd intersection on Highway 7 to realign River Road at the 272nd intersection (see below Photo #3). 

Aerial view of road paved road and train track winding through countryside.

Photo #1 - Turnaround at the West end of the Project near 263rd   (May 2024)

Water truck spraying water on a construction site with a compactor in the background and trees in the distance.

Photo #2 - 287th turnaround (May 2024)

 A construction site features a retaining wall made of concrete blocks, piles of large rocks, a gravel path, and an orange traffic cone. Dense forest is seen in the background.

Photo #3 - Lockblock wall at 272nd and River Rd (April 2024)

Project Benefits

This project will:

  • Increase capacity by providing two travel lanes in each direction (four lanes total), reducing congestion
  • Improve safety, by reducing the risk of a serious cross-over collision through installation of roadside and median barriers between 287th Street and Spilsbury Road
  • Provide safe turn-arounds to maintain access to all properties along the highway
  • Widen the 272nd / River Road intersection to accommodate large trucks

Schedule

  • Project completion expected in fall 2024.

Public Consultation

Public input, along with technical analysis, stakeholder and interest group coordination, and cost consideration helped shape the current design.

In winter 2021, public engagement was held to understand concerns and potential ideas for improvement. There were over 2,000 visits to the project website during the engagement period, 263 completed feedback forms, and several written submissions. We continue to engage with local stakeholders, interest groups, and Indigenous communities to further refine the design.

Connect with TranBC

Visit the TranBC blog

Contact information

Friendly Url for this Page:
gov.bc.ca/highway7widening

For information about this project, contact

Mailing
Ministry of Transportation and Infrastructure
South Coast Regional Office
Suite 310 – 1500 Woolridge Street
Coquitlam, BC V3K 0B8
Attention: Highway 7 – 266th Street to 287th Street