Submission for Tenders Expires: September 10, 2024
Project Number: 04529-0001
Contract ID: 04529MJ0001
Location: The site is located at Holt Creek along the Cowichan Valley Trail, 7 km West of Duncan, BC.
Description: The Holt Creek Bridge Replacement Project will replace the existing Holt Creek Timber Trestle with a new single-span steel structure completed with timber deck for pedestrians, cyclists, and equestrians. The new bridge structure will ensure a safe and accessible trail connection for Trans Canada Trail active transportation corridor, connecting the Lake Cowichan, Shawnigan Lake and Duncan areas.
Document |
Document Description |
---|---|
1 |
|
2 |
Holt Creek Bridge Replacement – Mile 59.7 – Geotechnical Design Report |
3 |
|
4 |
|
5 |
|
6 |
Step A Screening Summary – Holt Creek Bridge No. 10543 Replacement |
7 |
|
8 |
|
9 |
|
10 |
|
11 |
Cowichan Valley Trail – Structure Condition & Inspection Report 2024 |
12 |
|
13 |
|
14 |
|
15 |