Submission for Tenders Expires: November 26th, 2024
Project Number: 17066-0000
Contract ID: 17066MJ0000
Location: The northbound site is located in the LKI system on Segment 410 on KM 0.00 to 2.86 (exiting on Burnside Rd to Highway 1A signal). Southbound entering Highway 1 from the east side of Highway 1A signal along Segment 411 from KM 7.39 to 10.89.
Description: Highway 1 widening to accommodate a bus on shoulder lane from McKenzie interchange to Colwood interchange in both inbound and outbound directions. Includes rock blasting, sound/retaining wall installation, proposed galloping goose trail pedestrian bridge.
"THE PROJECT WILL RECEIVE FUNDING FROM THE FEDERAL GOVERNMENT UNDER THE CANADA-BRITISH COLUMBIA INTEGRATED BILATERAL AGREEMENT FOR THE INVESTING IN CANADA INFRASTRUCTURE PROGRAM"
Document
Number
|
Document Description
|
1
|
Cross Sections - L100-XSEC-R1-1065-1001 to 1012
|
2
|
Cross Sections - L200-XSEC-R1-1065-1013 to 1022
|
3
|
Cross Sections - L300-XSEC-R1-1065-1023 to 1032
|
4
|
Cross Sections - L400-XSEC-R1-1065-1033 to 1037
|
5
|
Cross Sections - L450-XSEC-R1-1065-1038 to 1039
|
6
|
Cross Sections - L500-XSEC-R1-1065-1040 to 1041
|
7
|
Cross Sections - L600-XSEC-R1-1065-1042 to 1044
|
8
|
Cross Sections - L650-XSEC-R1-1065-1045 to 1046
|
9
|
Cross Sections - L700-XSEC-R1-1065-1047 to 1048 |
10
|
Cross Sections - L750-XSEC-R1-1065-1049 to 1050 |
11
|
Cross Sections - L900-XSEC-R1-1065-1051 to 1052 |
12
|
Cross Sections - L10-XSEC-R1-1065-1053
|
13
|
Cross Sections - L20-XSEC-R1-1065-1054 |
14
|
Cross Sections - L30-XSEC-R1-1065-1055 to 1056 |
15
|
Cross Sections - L40-XSEC-R1-1065-1057 to 1066 |
16
|
Highway 1 – Bus on Shoulder Detailed Design Geotechnical Report, August 26, 2024.- G-1 |
17
|
Step B Soil Characterization, Highway 1 Bus on Shoulder Lanes McKenzie to Colwood Interchange, Victoria, BC, July 12, 2024 – G-2 |
18
|
Highway 1 Bus on Shoulder McKenzie to Colwood Interchange – Victoria, BC, Metal Leaching / Acid Rock Drainage Assessment, September 18, 2023 – G-3 |
19
|
Highway 1 Bus on Shoulder Mckenzie to Colwood Interchange – Victoria, BC (Portage Road), Metal Leaching / Acid Rock Drainage Assessment (Rev.1), August 16, 2024.- G-4 |
20
|
View Royal Sewerage System Contract 79-759 ----- Areas 1&6, 25-S132-7, December 22, 1989.- C1 |
21
|
View Royal Sewerage System Contract 79-756 ----- Area 4, 25-S126-13, December 18, 1989.- C2 |
22
|
View Royal Sewerage System Contract 79-769 - Thrust Boring, 25-S124-3, March 4, 1980.-C3 |
23
|
Victoria General Hospital – Northern – Trunk Sewer, 25-S109-1, December 18, 1989.- C4 |
24
|
View Royal Sewerage System Contract 79-756 ----- Area 4, 25-S126-8, July 7, 1988.- C5 |
25
|
TCH -120m East of TCH & Burnett Rd, Sheet 134, August 1996 – C6 |
26
|
As Built 150mm Watermain Plan/Profile St. Giles and Camden Ave, Drawing No. 3478, December 1997.- C7 |
27
|
Watermain Relocation - Spencer Road to Highland Road Plan & Profile, Drawing No. 3369-1 to 3369-3, April 1995 – C8 |
28
|
Watkiss Pressure Regulating Station – Watkiss Way @ Marler Drive, Drawing No. 3646-1, May 2004 – C9 |
29
|
Water Supply Main No. 3 Relocation, Drawing No. R1-815-801 to R1-815-802, July 13, 2016 – C10 |
30
|
St. Giles Cathodic Protection Anode Groundbed Layout Plan, Drawing No. 5940, Sheet 1 to 2, May 28, 2021 – C11 |
31
|
Trans Canada Hwy – Wilkinson Rd – Belgrave sewer, drain, & water, 184-83, Sheet 1 to 11, December 4, 1984 – S1 |
32
|
Residual Solids Forcemain and Centrate Return Line, Sheet 1 to 3, July 27, 2021 – S2 |
33
|
Grange Rd Widening & Drain Construction, 15-77, July 27, 1977 – S3 |
34
|
Portage Road Watermain Construction & Replacement, Sheet 1 to 4, June 1977 – S4 |
35
|
Portage Road/Skeena Place, Drawing No. 85-99, May 17, 2005 – S5 |
36
|
Grange Road Replacement of 2” Watermain, Drawing No. 144-76, September 8, 1976 – S6 |
37
|
Grange Road Pumping Station, Drawing No. C102, Sheet 3, March 2016 – S7 |
38
|
View Royal Dwg. No. VR94-5-2, Sheet 2 of 2, March 18, 1994 – V1 |
39
|
Avanti 22 Record information Camden Avenue – Plan & Profile, Sheet 2 of 2, August 8, 2019 – V2 |
40
|
Victoria Youth Custody Centre Site Servicing Plan (West) – Civil, Sheet 2 to 3, Feb 23, 2001 - V3 |
41
|
Fortis BC One Call 20230307910, Sheet 1 to 5, January 16, 2023.- F1 |
42
|
Victoria Power District Distribution U/G Duct Installation, R500-U07-D1821, Sheet 1 to 2, July 10, 1996 – H1
|
43
|
Underground Duct and Structures for Dip Service to Pump House, Drawing No. 500-U07-01999, Sheet 1, December 13, 2017 – H2 |
44
|
Primary Dip Service to Vic. Youth Custody CNT, Drawing No. R500-U07-C4728, September 1, 2002 – H3 |
45
|
Duct Installation across the Trans Canada Highway between Burnett Rd and Talcott Rd, Drawing No. R500-U07-C4222, April 16, 1997 – H4 |
46
|
Duct and Wiring Installation 41 Helmcken Rd, R500-U07-B4049, Sheet 1, June 10, 1996 – H5 |
47
|
Duct Installation and Wiring Details to Strata Subdivision on Vickery Rd, Drawing No. R500-U07-B3875, March 13, 1998 – H |
48
|
Duct and Wiring Details for Trans Canada Highway Crossing between Vickery Rd and Erskine Lane, Drawing No. R500-U07-C3975, Sheet 1, March 8, 1996 – H7 |
49
|
BC Hydro One Call 20230307910_SCHEMATIC, Sheet 2 to 5, January 16, 2023 – H8
|
50
|
Proposed underground Conduit Construction (Vickery Rd – Helmcken Rd), HUI-24-0414, Sheet 1 to 2, February 27, 1996 – T1 |
51
|
Proposed underground Conduit Construction (St. Giles St), HUI-24-0415, Sheet 1, February 27, 1996 – T2 |
52
|
Proposed underground Conduit Construction (Chancellor Ave), HUI-24-0416, Sheet 1 to 2, February 13, 1996 – T3 |
53
|
Proposed underground Conduit Construction (Galloping Goose Trail), HUI-24-0420, Sheet 1 to 2, February 28, 1996 – T4 |
54
|
Proposed UG Construction Trans-Canada HWY, HUD-24021, Sheet 1 to 2, April 18, 1977 – T5 |
55
|
TELUS BC One Call 20230307910, Sheet 2 to 16, December 1, 2023 – T6 |
56
|
Environmental Assessment for the Highway 1 Bus on Shoulder McKenzie to Colwood Project Rv3, August 26, 2024 – E1 |
57
|
Environmental Impact Assessment for the Galloping Goose Pedestrian Bridge as part of the Highway 1 Bus on Shoulder McKenzie to Colwood Project Rv3, August 30, 2024 E2 |
58
|
McKenzie Interchange Sounds Walls 2a, 2b and 2c, September 11, 2020 – E3 |
59
|
Tender Data - Part 1
|
60
|
Tender Data - Part 2
|
61 |
Shirley Pit Aggregate Technical Summary Memorandum, March 2, 2023 |