Project No. 24583-0001

Last updated on September 3, 2024

Highway No. 1 Selkirk Mountain 4 Laning


Submission for Tenders Expires: September 6, 2024

Project Number: 24583-0001

Contract ID: 24583MJ0001

Location: The Site is located on Highway 1 approximately 40 km west of Golden, BC within the Rocky Mountain District. Landmark Kilometre Inventory (LKI) Segment 1818, LKI KM 16.1 to KM 20.0.

Description: The work involves most common aspects of highway construction. The scope of work includes the following: Widening 3.9 km of highway to four lanes including installation of median barrier, two wildlife structures, and construction of a new rest area

 

Document
Number

Document Description

1

Selkirk Mountain 4 Laning Geotechnical Investigation Factual Report (WSP)

2

Selkirk Wildlife Crossings Detailed Design Hydrotechnical Report (Stantec)

3

Wildlife Crossing Riparian Prescriptions  

4

Selkirk 4-Laning Project, ML/ARD Material Management Plan (Tetra Tech)

5

Results of Humidity Cell Tests – Type A Materials for the Highway No. 1 Selkirk Mountain 4-Laning Project (SNC-Lavalin Inc.)

6

ML/ARD Assessment to Support Selkirk Mountain 4-Laning Project (SNC-Lavalin Inc.)

7

Selkirk Passing Lane ML/ARD Assessment (Lorax Environmental Services Ltd.)

8

Selkirk Passing Lane ML/ARD Assessment (Lorax Environmental Services Ltd.)

9

Letter of Understanding re Project Definition Sub-Appendix – Selkirk Mountain

10

BCIB – Contractor Agreement – Selkirk Mountain

11

BCIB Health and Safety Policy - 2020

12

BCIB Workplace Monitoring Policy

13

BCIB Apprenticeship and Training Targets – Selkirk Mountain Project

14

BCIB Contractor Discipline Process Policy

15

BCIB Contractor How to Guide – v26 – Nov 2023

16

BCIB Contractor Employee Request – Template

17

8.400 Permit Request Form – Template

19

9.505 Permit Request Form – Template

20

BCIB Recommendation for Discipline Form

21

BCIB - CBA End of Work Form

22

BCIB Leave of Absence Form

23

BCIB Labour Forecast Template - Selkirk

24

BCIB Whistleblower Policy

25

BCIB Arbitrator’s Decision on CBA Monetary Items Update Memo

26

Snowcat Pit Location Plan

27

Snowcat Pit Legal Plan

28

Snowcat Pit Technical Information Report

29

Waitabit Pit Location Plan

30

Waitabit Pit Legal Plan

31

Waitabit Pit Technical Information Report

32

Quartz Creek Pit Location Plan

33

Selkirk Mountain 4 Laning Quartz Creek Rest Area Geotechnical Investigation Factual Report

34

Selkirk Site Restoration Nov 20, 2023 - DRAFT 

35

Selkirk Mountain 4 Laning Quartz Creek Rest Area Geotechnical Investigation Factual Report

36

Selkirk Site Restoration Nov 20-2023 

37

BCIB - Subcontractor Agreement – Selkirk Mountain

38

Amended and Restated Community Benefits Agreement

39

CBA Wage Tables

40

Drug and Alcohol Policy Procedures

41

Workplace Discrimination and Harassment Policy Procedures
42 Selkirk 100% Detailed Design Cross Sections
43 Selkirk Civil 3D Data Package
44 Oldman Pit Plan