Submission for Tenders Expires: May 23, 2024
Project Number: 13253-1001
Contract ID: 13253MJ1001
Location: Highway 1 between Lefeuvre and Ross Road in Abbotsford, BC.
Description: Widening of Highway 1 to accommodate new High Occupancy Vehicle, Bus on Shoulder, and Auxiliary lanes; including replacement of the Bradner Road overpass structures. Construction of a new Multi-Use Path adjacent to Highway 1. Expansion and rehabilitation of the Bradner Rest Area and construction of new environmental enhancements at Nathan Creek.
Document
Number
|
Document Description
|
1
|
Environmental Impact Assessment, Highway 1 Tender 2: Mainline West (Station 1073 to Ross Road) and associated appendices, by McElhanney Limited and Associated Environmental Consultants Inc., February 2024 (zip file)
|
2
|
Step B Soil Characterization Program, Phases 3A and 3B of the Fraser Valley Highway 1 Corridor Improvement Program, 264th Street (Langley) to Highway 11 Interchange (Abbotsford), BC, by AtkinsRealis (formerly SNC-Lavalin), DRAFT, January 8, 2024
|
3
|
Step B Soil Characterization Program, Bradner North Enhancement Area, Fraser Valley Highway 1 Corridor Improvement Program, Abbotsford, BC, by SNC-Lavalin, December 15, 2023
|
4
|
Baseline (Summer and Winter) Testing (Phase 3) Memorandum, Highway 1 Widening from Lefeuvre to Ross Road (Mainline West), Abbotsford, BC, by Active Earth Engineering Ltd., December 19, 2023
|
5
|
Soil Characterization Roll Plot (Drawing SC-001), ISL Engineering and Land Services Ltd., February 29, 2024
|
6
|
Knotweed Soil Removal Plan, April 17, 2024 |
7
|
Tree Management Plan, Sketch T1, by McElhanney, January 31, 2024
|
8
|
Tree Management Report for Hwy 1 264th Street to Whatcom Road – Bradner Road Rest Area, by McElhanney, February 29, 2024
|
9 |
Fraser Valley Highway 1 Corridor Improvement Program, Bradner North Environmental Habitat Enhancement – IFT Design Report, by McElhanney, February 29, 2024 |
10 |
Water Sustainability Act, Section 11 Application Report by McElhanney Ltd. and Associated Environmental Consultants Inc., January, 2023 (Final Revision A). |
11 |
Water Sustainability Act, Section 11, Work Site Description of Works Table (Version 2). Prepared by McElhanney Ltd, submitted to the Ministry of Forests on June 20, 2023 |
12(a) |
Fisheries Act Authorization Application SAR File No. 22-HPAC-01474 |
12(b1) |
(Part 1) Application Report and its Associated Appendices (zip) |
12(b2) |
(Part 2) Application Report and its Associated Appendices (zip) |
13 |
Provincial Agricultural Land Commission – Applicant Submission, January 11, 2024 |
14 |
Pavement Structure Geotechnical Investigation Factual Report, by Thurber Engineering Ltd., March 15, 2023 |
15 |
Highway 1 - 264 Street to E. of Whatcom Road, Mainline West Segment Pavement Design Report, Tetra Tech Canada Inc., February 26, 2024 |
16 |
Highway 1 - 264 Street to Whatcom Road – Segment 1 - Mainline West Geotechnical Design Report Issued for IFT Submission, by Thurber Engineering Ltd., February 27, 2024 |
17 |
Highway 1 – 264 Street to Whatcom Road, WAR#4 – Bradner Road Rest Area Improvements Geotechnical Report, by Thurber Engineering Ltd., March 28, 2023 |
18 |
Highway 1 – 264 Street to Whatcom Road – Segment 1 Mainline West Geotechnical Factual Data Report, by Thurber Engineering Ltd., November 28, 2023 |
19 |
Fraser Valley Highway 1 Corridor Improvement Program – 264 Street to Whatcom Road, Geotechnical Input for Waste Berm Area, Memo, by Thurber Engineering Ltd., January 15, 2024 |
20 |
Bradner Preload Advanced Settlement Data, by Thurber Engineering Ltd., April 11, 2024 |
21 |
Fraser Valley Highway 1 Corridor Improvements – Environmental Habitat Enhancements – Bradner North & Nathan Creek, by Thurber Engineering Ltd., July 12, 2023 |
22 |
Bradner Road SLAT Operations Review, by ISL Engineering, February 28, 2024 |
23 |
01608E - Existing Bradner Road Overpass Bridges As-built Drawings (Eastbound) |
24 |
01608W - Existing Bradner Road Overpass Bridges As-built Drawings (Westbound) |
25 |
Highway 1 Six Laning – Lefeuvre Road to Ross Road, Suggested Construction Staging |
26 |
Highway 1 Six Laning – Lefeuvre Road to Ross Road, Existing Utilities |
27 |
Highway 1 Six Laning – Lefeuvre Road to Ross Road, Utility Coordination Plan |
28 |
Highway 1 Six Laning – Lefeuvre Road to Ross Road, Reference Cross Sections |
29 |
Bradner Rest Area Improvements, Utility Prelocate Plan |
30 |
Bradner Rest Area Improvements, Reference Cross Sections |
31 |
Reference Cross-Sections |
32 |
Drawing Package 1 MLW Lefeuvre Rd-Ross Rd 2300TenderData 1 o 4 (zip) |
33 |
Drawing Package 1 MLW Lefeuvre Rd-Ross Rd 2300TenderData 2 o 4 (zip) |
34 |
Drawing Package 1 MLW Lefeuvre Rd-Ross Rd 2300TenderData 3 of 4 (zip) |
35 |
Drawing Package 1 MLW Lefeuvre Rd-Ross Rd 2300TenderData 4 of 4 (zip) |
36 |
Drawing Package 2 Bradner Rest Area 2300TenderData 1 of 1 (zip) |
37
|
Drawing Package 3 Bradner N Env Habitat 2300TenderData 1 of 1 (zip)
|
38 |
Construction Labour Relations Association of BC:
https://www.clra-bc.com/ |
39
|
PLA - Fraser Valley Highway 1 Corridor Improvement Program - SIGNED
|
40
|
Water Sewer Testing Hwy 1 Mainline West |
41 |
Fraser Valley Highway 1 Corridor Improvement Program Project Labour Agreement – Wage Grid May 2024 |
42
|
TELUS Drawing No. 2923245_P Rev.0 - PERMIT DESIGN FOR TEL POLE 375443 RELOCATION |
43 |
TELUS Drawing No. 2897429_P1 Rev.2 - PERMIT DESIGN FOR POLE RELOCATION |
44 |
TELUS Drawing No. 2919085_U Rev.A - CONDUIT REPAIR ORDER DESIGN |
45 |
Estimated Restoration Planting Treatment Areas – Drawing Package 1 |
46 |
Bradner Rest Area Water Well Pump Set Record 92313 |
47 |
Bradner Road Gas Main Concept Drawing #R1-1105-822 |
48 |
R1-1105-1105EXWAT |