Project No. 12712-0001

Last updated on August 2, 2024

Highway 3 Snass Creek Bridge No. 1214


Submission for Tenders Expires: August 15, 2024

Project Number: 12712-0001

Contract ID: 12712MJ0001

Location: Highway 3, E.C. Manning Provincial Park, approximately 38 kilometres east of Hope, BC.

Description: Remove and replace the existing Snass Creek Bridge with a new 24.8m, single-span, three-lane bridge including, but not limited to, construction of piled foundations, cast-in-place concrete abutments, supply and installation of precast prestressed concrete girders, supply and placement of cast-in-place concrete deck slab, and approach slabs. Work includes the construction of a two-lane temporary detour with detour bridge to accommodate two-way traffic through construction, channel improvements and restoration planting.

 

Document
Number

Document Description

1

MoE Park Use Permit 102340 (Final)_Forestry_MuleDeer.pdf
 

2

Forestry_0229_LocPlan_Proj12712-0001_Fig1.pdf
 

3

Forestry_0229_AggregateTestSummaries_Compiled (2012-1997).pdf
 

4

Forestry_0229_Test Reports (2012-1997).pdf
 

5

MOTI10866_Snass_RFR20240111_v2.0_Compressed.pdf
 

6

MOTI10866_Snass_WSA Appl_20240110_v2.0_compressed.pdf
 

7

As-Built Drawings
 

8

Hwy#3 Snass Creek Bridge Replacement Geotechnical Design Memorandum_100% Submission.pdf
 

9 MoTI_07-RG-1043_Factual Geotechnical Report_Hwy#3 Snass Creek Bridge Final.pdf
 
10 Cross Sections
 
11 Detour Reference Design
 
12 Suggested Construction Staging